| Page URL: | http://www.fortronics.com/installation_and_maintenance/ |
| Date Printed: | Monday, 6 September, 2010 |
| Page Name : | Installation And Maintenance |
Installation and MaintenanceInstallation:An installation kit is included and instructions supplied. Using the mounting bracket supplied, position the transmitter so that the operator can see the front panel.
|
Maintenance:The Fortronics Electronic Choker System has been designed so that only minimal maintenance is required. It is important that the trigger and locking pin mechanism are cleaned and greased periodically. Depending upon operating conditions this requirement might be every one, two or three months. |
Copyright © Fortronics LTD . All rights reserved. You may not copy, republish or distribute this page or the content from it without having obtained written permission from Fortronics LTD . Page generated by the Xsite Content Management System. |